hidden pixel

Advanced Boiling Water Reactor Information

The Advanced Boiling Water Reactor (ABWR) is a Generation III boiling water reactor. The ABWR is currently offered by GE Hitachi Nuclear Energy (GEH) and Toshiba. The ABWR generates electrical power by using steam to power a turbine connected to a generator; the steam is boiled from water using heat generated by fission reactions within nuclear fuel.

Boiling water reactors (BWRs) are the second most common[1] form of light water reactor with a direct cycle design that uses fewer large steam supply components than the pressurized water reactor (PWR), which employs an indirect cycle. The ABWR is the present state of the art in boiling water reactors, and is the first Generation III reactor design to be fully built, with several reactors complete and operating. The first reactors were built on time and under budget in Japan, with others under construction there and in Taiwan. ABWRs are on order in the United States, including two reactors at the South Texas Project site.

The standard ABWR plant design has a net output of about 1350 MWe (3926 MWth). It has also been certified as a final design in final form by the U.S. Nuclear Regulatory Commission, meaning that its performance, efficiency, output, and safety have already been verified, making it bureaucratically easier to build it rather than a non-certified design[2].

Contents

Overview of the design

Pressure vessel from the ABWR. 1: Reactor core 2: Control rods 3: Internal Water Pump 4: Steam pipeline to the Turbine generator 5: Cooling water flow to the core

The ABWR represents an evolutionary route for the BWR family, with numerous changes and improvements to previous BWR designs.

Major areas of improvement include:

The RPV and Nuclear Steam Supply System (NSSS) have significant improvements, such as the substitution of RIPs, eliminating conventional external recirculation piping loops and pumps in the containment that in turn drive jet pumps producing forced flow in the RPV. RIPs provide significant improvements related to reliability, performance and maintenance, including a reduction in occupational radiation exposure related to containment activities during maintenance outages. These pumps are powered by wet-rotor motors with the housings connected to the bottom of the RPV and eliminating large diameter external recirculation pipes that are possible leakage paths. The 10 internal recirculation pumps are located at the bottom of the annulus downcomer region (i.e., between the core shroud and the inside surface of the RPV). Consequently, internal recirculation pumps eliminate all of the jet pumps in the RPV, all of the large external recirculation loop pumps and piping, the isolation valves and the large diameter nozzles that penetrated the RPV and needed to suction water from and return it to the RPV. This design therefore reduces the worst leak below the core region to effectively equivalent to a 2-inch-diameter (51 mm) leak. The conventional BWR3-BWR6 product line has an analogous potential leak of 24 or more inches in diameter. A major benefit of this design is that it greatly reduces the flow capacity required of the ECCS.

The first reactors to use internal recirculation pumps were designed by ASEA-Atom (now Westinghouse Electric Company by way of mergers and buyouts, which is owned by Toshiba) and built in Sweden. These plants have operated very successfully for many years.

The internal pumps reduce the required pumping power for the same flow to about half that required with the jet pump system with external recirculation loops. Thus, in addition to the safety and cost improvements due to eliminating the piping, the overall plant thermal efficiency is increased. Eliminating the external recirculation piping also reduces occupational radiation exposure to personnel during maintenance.

A nice operational feature in the ABWR design is electric fine motion control rod drives, first used in the BWRs of AEG (later Kraftwerk Union AG, now AREVA). Older BWRs use a hydraulic locking piston system to move the control rods in six-inch increments. Additionally the fine motion control rod design greatly enhances positive actual control rod position and similarly reduces the risk of a control rod drive accident to the point that no velocity limiter is required at the base of the cruciform control rod blades.

The ABWR is fully automated in response to a loss-of-coolant accident (LOCA), and operator action is not required for 3 days. After 3 days the operators must replenish ECCS water supplies. These and other improvements make the plant significantly safer than previous reactors.

Locations

As of December 2006[update], four ABWRs were in operation in Japan: Kashiwazaki-Kariwa units 6 and 7, which opened in 1996 and 1997, Hamaoka unit 5, opened 2004 having started construction in 2000, and Shika 2 commenced commercial operations on March 15, 2006. Another two reactors are nearing completion at Lungmen in Taiwan, and one more (Shimane Nuclear Power Plant 3) in Japan, with major siteworks started in 2008 and completion planned for 2012.

Other ABWRs are planned for Japan, and ABWRs are also proposed for construction in the United States under the Nuclear Power 2010 Program. An incentive for construction of an ABWR is that the Nuclear Regulatory Commission (NRC) approved the ABWR design in 1997 and construction would have a smaller regulatory burden for approval; hence ABWRs may be constructed faster than other designs pending approval.

On June 19, 2006 NRG Energy filed a Letter Of Intent with the Nuclear Regulatory Commission to build two 1358 MWe ABWRs at the South Texas Project site. [5] On September 25, 2007, NRG Energy and CPS Energy submitted a Construction and Operations License (COL) request for these plants with the NRC. NRG Energy is a merchant generator and CPS Energy is the nation's largest municipally owned utility. The South Texas project was cancelled in March, 2011.

Reliability

The four ABWRs in operation were often shut down due technical problems. The International Atomic Energy Agency documents this with the 'operating factor' (= the time with electricity feed-in relative to the total time since commercial operation start). The first two plants in Kashiwazaki-Kariwa (block 6 & 7) reach operating factors below 70 %, meaning that about 30% of an average year they aren't producing electricity.[3][4] In contrast other modern nuclear power plants like the Korean OPR-1000 or the German Konvoi show operating factors of about 90 %.[5]

The output power of the two new ABWRs at the Hamaoka and Shika power plant had to be lowered because of technical problems in the turbines.[6] After throttling both power plants still have a heightened downtime and show other their lifetime operating factors under 50 %.[7][8]

Reactor block[9] Net output power (planned net output power) Commercial operation start Operating Factor[10] since operation start from 2011
HAMAOKA-5 1212 MW (1325 MW) 18.01.2005 46,7 %
KASHIWAZAKI KARIWA-6 1315 MW 07.11.1996 69,6 %
KASHIWAZAKI KARIWA-7 1315 MW 02.07.1996 64,1 %
SHIKA-2 1108 MW (1304 MW) 15.03.2006 47,1 %

Deployments

Plant Name Number of Reactors Rated Capacity Location Operator Construction Started Year Completed (First criticality) Cost (USD) Notes
Kashiwazaki-Kariwa Nuclear Power Plant 2 1356MW Kashiwazaki, Japan TEPCO 1992,1993 1996,1996 First Installation
Shika Nuclear Power Plant 1 1358MW Shika, Japan Hokuriku Electric Power Company 2001 2005
Hamaoka Nuclear Power Plant 1 1267MW Omaezaki, Japan Chuden 2000 2005 On May 14, 2011 Hamaoka 5 was shut down by the Japanese government request. The plan is located in the area with high probability of tsunami accident.
Shimane Nuclear Power Plant 1 1373MW Matsue, Japan Chugoku Electric Power Company 2007 2011
Lungmen Nuclear Power Plant 2 1350MW Gongliao Township, Republic of China Taiwan Power Company 1997 2011 $9.2 Billion Under Construction, Completion Est. December 2011
Higashidōri Nuclear Power Plant 3 1385MW Higashidōri, Japan Tohoku Electric Power and TEPCO 2010 Est 2017 All units Under Construction
Ōma Nuclear Power Plant 1 1383MW Ōma, Japan J-Power 2010 Est 2014 Under Construction, First nuclear plant for J-Power
South Texas Project 2 1358MW Bay City, United States NRG Energy, TEPCO and CPS Energy $14 billion Cancelled March 2011[11]

References and notes

  1. ^ http://world-nuclear.org/NuclearDatabase/rdResults.aspx?id=27569
  2. ^ "Design Certification Information Page - ABWR". Design Certification Applications. Federal Government of the United States, U.S. Nuclear Regulatory Commission, Rockville, MD, USA. 2009-06-03. http://www.nrc.gov/reactors/new-reactors/design-cert/abwr.html. Retrieved 2009-08-28.
  3. ^ http://www.iaea.org/cgi-bin/db.page.pl/pris.ophis.htm?country=JP&site=KASHIWAZAKI%20KARIWA&units=&refno=55&opyear=2010&link=HOT]
  4. ^ [1]
  5. ^ IAEA - Nuclear Power Reactors in the World - 2010 Edition - Vienna 2010
  6. ^ [2]
  7. ^ [3]
  8. ^ [4]
  9. ^ Power Reactor Information System of the IAEA: Japan: Nuclear Power Reactors - Alphabetic“ (englisch)
  10. ^ NEPIS Manual
  11. ^ NRG ends project to build new nuclear reactors

See also

External links

Nuclear technology
Science
Fuel
Neutron
Reactors
Fission reactors by moderator
Water
Carbon
FLiBe
None (Fast)
Fusion reactors by confinement
Magnetic
Inertial
Other
Power
Medicine
Imaging by radiation
Gamma camera
X-ray
Therapy
Weapon
Topics
Lists
Waste
Products
Disposal
Debate

Categories:

 

The above information uses material from Wikipedia and is licensed under the GNU Free Documentation License.
Some facts may not have been fully verified for accuracy. [Disclaimers]
This page was last archived by our server on Sun Feb 19 19:33:17 2012.
Displaying this page or its contents does not use any Wikimedia Foundation's resources.
The owners of this site proudly support the Wikimedia Foundation.